Yuen Long Effluent Polishing Plant
Adjacent to Ecologically Sensitive Area
YLEPP is located in the vicinity of recognized sites of conservation importance. They include Inner Deep Bay Site of Specific Scientific Interest (SSSI), Mai Po Marshes SSSI, Mai Po Marshes Nature Reserve and Mai Po Inner Deep Bay Ramsar Site, nearby fishponds and mangrove/mudflat along the embankments and at the confluence of Shan Pui River and Kam Tin Main Drainage Channel. According to pre-construction survey, active night roost areas were observed. Four ardeid species including the Chinese Pond Heron Ardeola bacchus, Great Egret Ardea alba, Little Egret Egretta garzetta, and Grey Heron Ardea cinerea were observed utilizing the roosting sites.
YLEPP Project is a designated project under Schedule 2 of the Environmental Impact Assessment Ordinance (EIAO) (Cap. 499). The statutory Environmental Impact Assessment (EIA) was conducted and the EIA report and Environmental Monitoring and Audit (EM&A) Manual was approved by EPD (Register No.: AEIAR-220/2019) on 25 April 2019. An Environmental Permit (EP) (EP No. EP-565/2019) was issued by EPD on 26 April 2019.
The EIA report and EM&A Manual has addressed the environmental concerns holistically in various aspects. For further details, please refer to Environmental Protection Department’s website: https://www.epd.gov.hk/eia/english/alpha/aspd_737.html
The major requirements imposed during construction phase of YLEPP are summarized as follows: